UK-wide · 24/7 emergency cover

Facilities and property management across the UK

Hard FM, soft FM, compliance, reactive maintenance and commercial property management, plus refurbishment and construction projects. One accountable team: every issue gets a status, an owner and a next step.

Own team + KPI-managed specialists Monthly reporting English & 中文

Service commitments

Response times you can hold us to

The same standards apply wherever your property is in the UK, and you see them reported every month.

Emergency attendance 24/7
Emergency attendance
2hours

24/7, including nights, weekends and bank holidays.

Non-emergency attendance
48working hours

Planned attendance for issues that are not emergencies.

First response
24working hours

Every reported issue is acknowledged with a named owner.

Progress updates
72hours

You are told what is happening until the job is closed.

Reporting
Monthly

Open issues, completed works, recurring defects and contractor performance.

How we work

Every issue has a status, an owner and a next step

A simple, visible process from the moment something is reported to the monthly report.

  1. 1

    Capture

    Logged with location, urgency and evidence such as photos or occupier reports.

  2. 2

    Assign

    A named owner allocates it to our own team or a suitable specialist subcontractor.

  3. 3

    Attend

    Emergencies within 2 hours, 24/7; other issues within 48 working hours.

  4. 4

    Verify & close

    Work is checked before closing, so "attended" is never confused with "fixed".

  5. 5

    Report

    Monthly reporting, with work orders and inspections available in your portal.

Our own staff Specialist subcontractors held to KPIs Percentage or fixed-fee options
Modern residential and commercial buildings beside the water
Experience managing purpose-built student accommodation

Sectors

Built around how your property is used

Each property type puts different pressure on facilities management. We set priorities around trading hours, residents and operations.

  • Offices
  • Retail
  • Mixed-use
  • Industrial & warehouse
  • Leisure
  • Student accommodation

See how we work in each sector

Refurbishment

Refurbishment that keeps the building working

We coordinate refurbishment from planning and design through contractors, site communication, snagging and handover. Because we also manage buildings, we plan every project around how it will run afterwards.

  • Smart building retrofit

    Upgrading existing buildings with modern controls, sensors and building systems.

  • Office refurbishment

    Workplace upgrades planned around occupiers, so disruption to the business is kept to a minimum.

  • Change of use

    Coordinating projects that convert a building to a new use, from early planning to handover.

Refurbishment projects and other works

Refurbished modern interior with reception area
Programme viewIllustrative
Design
Strip-out
Works
Handover

Construction

Construction delivered to UK process

Depending on how your project is procured, we can act as principal contractor, management contractor, project manager, project coordinator or subcontractor. We work to the RIBA Plan of Work stages, CDM 2015 and JCT contract processes.

  • Principal contractor
  • Management contractor
  • Project management
  • Project coordination
  • Subcontractor
RIBA Plan of Work stagesIllustrative

Stage 0 · Strategic DefinitionThe client's need and the best way to meet it are agreed.

Stage 1 · Preparation and BriefingProject brief, feasibility, budget and programme are set.

Stage 2 · Concept DesignThe design concept is developed and checked against the brief.

Stage 3 · Spatial CoordinationArchitectural and engineering design is coordinated before detailed design.

Stage 4 · Technical DesignThe information needed to build is completed and contracts are prepared.

Stage 5 · Manufacturing and ConstructionWork on site, with health and safety, quality and progress managed and reported.

Stage 6 · HandoverThe building is handed over with its records, and the contract is concluded.

Stage 7 · UseThe building in operation. This is where our facilities management team can take over.

FrameworkRIBA Plan of Work

Stages 0 to 7 give everyone a shared map of the project, from strategic definition to the building in use.

Health and safetyCDM 2015

Duties under the Construction (Design and Management) Regulations 2015, including the construction phase plan and the health and safety file at handover.

ContractsJCT processes

Contract administration that records valuations, variations and practical completion clearly.

Construction services

Construction Portal coming soon.

Client portals

Your buildings and projects, one sign-in away

Existing clients can follow work, documents and reports online. Choose the portal for your service.

All portals

Homoon will never ask for your portal password by email. Always sign in from this page or by typing the portal address yourself.

We work in English and Chinese

Owners, occupiers and international or Chinese-owned businesses can deal with us in either language.

我们提供中英文服务,欢迎用中文与我们沟通。

Contact us

Get started

Tell us about your property

Share the property type, its location and what you need under control, and we will reply with a practical next step.